Case Studies

The Gherkin

Client Arab Investments Location London Services D – E  – AV  The Pinnacle – Sales and Marketing Suite Audio Visual Install The Pinnacle was planned to be one of the highest skyscraper office spaces in London, based in the city in the Aldgate and City of London area. For this a Marketing Suite Audio Visual Install

Read more

House of Fraser

     Client: House of Fraser | Sector: Retail | Duration: Roll Out     Data installation for Wifi Roll Out A new data installation was required as part of a national upgrade for their public access WiFi. In association with Custom Communications we were tasked with installing the cabinets, fibre optic cabling and Cat6

Read more

Bath Store

     Client: Bath Store | Sector: Retail | Duration: 6 Months     Telephone and Data Cabling Services As part of a national upgrade to their incoming broadband and store refreshes, Bathstore were required to install new BT cabling into each of their 155 UK Stores. Thus new telephone and data cabling services were

Read more

Royal Mail

          Client: Royal Mail| Sector: Warehouse and Distribution|  Duration: Long Term     Expert Data Cabling Solutions Since 2001, NM Cabling has been an approved supplier for Royal Mail. As a result we have undertaken numerous national roll out projects for them. Furthermore the ongoing relocations and maintenance to these machines

Read more

Stables Market – Camden

  Client: Stables Market| Sector: Commercial|  Duration: 3 Months The project was undertaken in one of London’s busiest and most iconic locations. Subsequently it involved the building of a new modern commercial office building within stables market in the Camden market area. The commercial network cabling was a large part of the refurbishment Commercial Network

Read more

Lloyds Building – Lloyds IT Direct

  Client: Lloyds Building| Sector: Commercial|  Duration: Various Lloyds IT Direct – Office Cabling Services Based within the Lloyds building in London, Lloyds IT Direct were an internal IT Support and Solutions department. Subsequentley they would use collective buying power for better purchasing and installation of IT services. Primarily these were to the Lloyds of

Read more

Wellesley Hotel – Terrace Upgrade

  Client: Wellesley Hotel| Sector: Hospitality|  Duration: 5 Months Hotel Cabling and Electrical Overview The upgrade of the cigar terraces of the Wellesley Hotel involved the total stripping out the old structures. Furthermore replacing them with a modern bronze and glass architectural construction. Therefore as part of these changes the hotel cabling infrastructure and electrical

Read more

Project: Schaltbau Cat7 Data Cabling, Milton Keynes

  Client: Schaltbau  | Sector: Warehouse |  Duration: 2 Months Schaltbau is a electromechanical components and systems producer for transport and industrial applications. For their new offices they required a full Cat7 cabling installation The new office and warehouse unit based in Rooksley, Milton Keynes. The project was designed with a high specification structured cabling

Read more

Project: The Copperage, London

Data Cabling Case Study: Zoopla Client: Zoopla / Uswitch  | Sector: Property |  Duration: 4 Months Zoopla was based in 3 separate offices in South East London and due to continued growth and expansion they and Uswitch had out grown their existing London offices. The decision was made to relocate all the offices to a

Read more

Project: The Challenge Network | Multiple Sites

Data Cabling Case Study – Challenge Network Client: Reflective / Challenge Network | Sector: Offices | Duration: Ongoing The Challenge Network is a growing charity and hence taking on several new offices through the UK. NM Cabling has been the preferred Data Cabling, Electrical and Fibre Optic installer for all these new locations. The offices

Read more