VOIP System Case Study for The Sanctuary – Westminster Abbey
Client: Lee Bolton Monier Williams | Sector: Solicitors | Duration: 3 months
VoIP System Installation Westminster Abbey
In 2014 LBMW decided to upgrade their existing telephone system to a VOIP system.
Due to old legacy cabling there was a requirement to upgrade the existing data cabling infrastructure to a Cat6 system over 5 floors
A satellite cabinet was placed on each floor and linked over fibre optic cabling backbones to the main communications room
From these cabinets local wiring was installed to the desk locations for Computers and Telephone connections
The works involved a high level of project management as all works had to be conducted out of hours with special attention to events on at Westminster Abbey when noisy works of any kind and deliveries had to be avoided.
Also the ground floor panelling was listed so creative routing was required in these areas for the installation
The works were completed over a series of weekends – ahead of schedule