Case Studies

Data Cabling Case Studies

Data Cabling London, Network and AV Cabling in London – NM Cabling Solutions.
Serving all areas of London and the Home Counties  providing the best data cable and network cabling for offices, hotels and apartments.

Complete cabling services offered :-
Structured Cable solutions such as Cat5e / Cat6 and Cat6A.
Bundle Cabling solutions ideal for the Data centre environment and new builds with false floors.  Fibre Optical Installations ( Multimode & Single Mode). Telephone Cabling.
MAC (Moves, Adds and changes).

See our testimonials page for more about NM Cabling service.

Save

Save

Project: Rowberry Morris Reading and Staines Offices Data Cabling Grade 2 Listed Building

Rowberry Morris Data Cabling Grade 2 Listed Building - Logo
Client: Rowberry Morris | Sector: Solicitors|  Duration: 1 Month

Rowberry Morris are a solicitors company with several offices based in Reading, Richmond and Tadley

Due to an upgrade to a VOIP Telephone system in the Reading and Staines offices new Cat5e cabling was required throughout both buildings

Due to the nature of the business all these works were carried out of hours over several weeks of overnight working requiring the data cabling installation and replacement of the office to its working condition for the next day.

Rowberry Morris Data Cabling Grade 2 Listed Building

The Cat5e wiring in both buildings were of totally opposite requirements

The Reading office is located in a listed 16th Century House, previously incorporated as a Village Inn

Due to the listed nature the structured cabling installation had very specific rules and requirements with regards to routes, drilling and containment of the data wiring

Special considerations where given to the timbers and structure of the building due to their listed nature.

As the photos show the building shows its age and character and everything was done to maintain the aesthetics and credibility of this structure

The Staines office was of a more straight forward data cabling installation.

Rowberry Morris Loft Area Data Cabling Grade 2 Listed Building.png

Located in a main room of shops and commercial buildings the building consisted of 3 floors.

The upper two floor were solid ceiling requiring data cabling trunking to be installed throughout to run the Cat5e cables

There was after a need to work within the building loft to route IT cabling on the upper floors.

Once again all work were undertaken overnight to minimise disruption to the business

Rowberry Morris Reading and Staines Offices Data Cabling Grade 2 Listed Building -See the full Case Study

 

 

Save

Save

Project: Schaltbau, Milton Keynes

Client: Schaltbau  | Sector: Transport |  Duration: 2 Months

Schaltbau structured cabling Cat7a and Om4 fibre

Schaltbau is a electromechanical components and systems producer for transport and industrial applications

The new office and warehouse unit based in Rooksley, Milton Keynes was designed with a high specification structured cabling system employing Cat7a throughout and Om4 fibre cabling links between server and main data cabling cabinets

Due to the high data cabling installation and termination requirements of Cat7a cabling, specific care was taken in the design, installation and positioning of the data cabling outlets

Cat7 Data Cabling

Schaltbau structured cabling Cat7a and Om4 fibre

The Cat7a data cabling would be employed for the Telephone Systems, IT Systems, WIFI and DECT Phone base stations

As the property was part offices and part warehouse space, data cabling was required to be installed from electric scissor lifts at 8m working heights. This would be required for running the data cabling to the WIFI and DECT access points

The Office space was only aesthetically refurbished so part of the data cabling design for NM Cabling was how to incorporate the containment for running and terminating the Cat7a structured cabling

A range of dado and maxi trunking was employed for this purpose

The installation of bespoke containment and shrewd design allowed the Cat7 cabling to maintain its bend radius and allow for correct termination at the user end

One of the challenges with cat7 cabling installations is the correct containment, pre designed routes and allowances which needed to be overcome on this project

Upon completion of the data cabling installation and termination the testing was undertaken with a specific Cat7 cabling tester. The last unique element of this project and any Cat7 cabling project

Schaltbau structured cabling  Cat7a and Om4 fibre cabling links -See the full Case Study

 

Save

Save

Project: The Copperage, London

Client: Zoopla / Uswitch  | Sector: Property |  Duration: 4 Months

Zoopla Structured Cabling Cat5e Cat6 and Cat6A.

Zoopla was based in 3 separate offices in South East London and due to continued growth and expansion they and Uswitch had out grown their existing London offices. The decision was made to relocate all the offices to a single location at The Cooperage near London bridge

The project was a total new office fit out for which NM Cabling were appointed for the installation of the Structured cabling systems, Data Cabinets, Audio Visual Data Cabling and Data Cabling Patching

The project was completed from structured cabling design through to IT commissioning.

Data Cabling

Cat6 data cabling was the basis of the horizontal cabling throughout the offices, run through false floors and along exposed cable tray such was the industrial design setting of the building

Cat6a data cabling was also installed for the audio visual system and to a dedicated cinema room.

OM3 fibre optic cabling was also installed as data links between satellite areas  within the building.

Structured Cable solutions Cat5e Cat6 and Cat6A for Uswitch

Upon completion of the horizontal IT Cabling and to keep continuity, Zoopla commissioned NM Cabling to patch in all of the IT Cabling, Telephone Cabling and WIFI Systems

This way a consistent data cabling patching installation was achieved and colour coded for ease of maintenance on their IT and Telephone cabling

The WIFI units were also mounted and commissioned along with the data cabling patching

Zoopla Structured Cabling Cat5e Cat6 and Cat6A. Data Cabling -See the full Case Study

Save

Save

Project: The Challenge Network | Multiple Sites

Client: Reflective / Challenge Network | Sector: Offices | Duration: Ongoing

The Challenge Network is a growing charity and hence taking on several new offices through the UK. NM Cabling has been the preferred Data Cabling, Electrical and Fibre Optic installer for all these new locations.

Data Cabling and Fibre optic Challenge Network Offices

The offices are in Waterloo, Epson, Kentish Town, Epsom, Birmingham, Leeds, Manchester and Reading and ranged from single floor locations to multiple offices spread throughout large city centre buildings.

Electrical Installation.

The offices are a mix of new, refurbished and modern serviced offices. The electrical installation has included floor box relocations, lighting installations, new power installation, comms room power and miscellaneous power sockets throughout the commercial floor space.

All works have been accredited under the NICEIC accreditation

Structured Cabling Installation

The offices have been a range of 80-500 outlets and a mixture of cat5e installations and cat6 installations.

Fibre Optic Cabling Installations London

There have also been numerous relocations and amendments to current layouts to use the existing office cabling where possible.

All new structured cabling installations have been fully Fluke tested and Manufacturer warrantied.

Fibre Optic Cabling Installation

The majority of the sites have expanded from initial occupation and involved the requirement of fibre optic cabling links between existing cabinets to satellite cabinets in other parts of the floor and other parts of the building

In Waterloo a 400m fibre optic cabling installation was required down 8 floor along an underground car park and back up another part of the building.

Wi-Fi Installation

A large portion of the company's network is run over Wi-Fi and therefore a large amount of data cabling has been installed for this purpose involving lots of high level data cabling installations.

The Wi-Fi access points were also installed for later setup by the charities IT provider

The Challenge Network - Electrical Installation, Data Cabling, Fibre Optic & Wifi Installation - See the Full Case Study

Save

Save

Project: 10 Manchester Street Hotel Structured Cabling, AV, Telephone and Wifi installation

Client: Arab Investments | Sector: Hotels / Hospitality | Duration: 11 Months

10 Manchester Street Hotel in Marylebone London is a 45 bedroom Boutique Hotel.

Structured Cabling for Hotel - Manchester Street Hotel

NM Cabling was tasked with the Structured Cabling installation, Audio Visual Installation, WIFI Installation and Telephone System Installation when the Hotel was refurbished.

Structured Cabling Installation

Data cabling was required throughout the hotel for Guest Bedroom, Public Areas, Offices, Bar, Restaurant and Reception.

Due to the nature of the old building, bespoke routes and solutions were required for the data cabling installation and terminations.

The network cabling was undertaken for all services within the building.

Audio Visual Installation

Audio Visual Installation for Hotel - Manchester Street Hotel

NM Cabling installed large screen televisions in every bedroom with audio visual links for guest connection, distributed aerial systems, data systems and digital signage to link back to the hotels management system.

Distributed music systems with zonal control and inputs were installed in the public areas.

Wi-Fi Installation

A free to access Wi-Fi system was installed through all guest bedroom, public and hotel management areas,

10 Manchester Street Hotel Structured Cabling, Audio Visual, Telephone and Wifi installation - See the full case study

Save

Save

Project: London Borough of Barnet - School Data Cabling and WiFi Installation Projects

Client: London Borough of Barnet | Sector: Education | Duration: 2001-present

Since 2001 NM Cabling has been a preferred supplier to London Borough of Barnet Schools ICT department

Structured Cabling Installation for schools -London Borough of Barnet School installation projects

An average 15-20 schools per year has been serviced for Electrical Installations, Structured Cabling Installations, Fibre Optics Installations and Audio Visual Installations

Several roll outs have also been undertaken in this time period involving a structured short time-scale allowing for installations during school holiday periods

Structured Cabling Installation

The schools have probably the widest diversity of all cabling installations based on the individual nature of each school, its location and its age.

Structured Cabling Installations has been a mixture of external installs, high level access installs, duct cabling installation, working on and over roofs to working in sub basements below the schools.

Virgin Broadband Roll Out

When the Borough swapped from BT to Virgin for its broadband it came with a new larger router and data switch which wouldn’t fit into the majority of schools existing data cabinets

A borough wide cabinet swap over was rolled out with the majority of schools having the old cabinets de-racked, replaced and re-patched with no down time to a single school during a 6 month period

Electrical Installation.

A wide range of electrical installations have been required within the schools. Ranging from new power installations within classrooms, Electrical installations to new ICT suites and electrical cabling to new porta cabin classrooms

All works have been accredited under the NICEIC accreditation

WiFi installation for schools - London Borough of Barnet School installation projects

Wi-Fi Installation

As the borough moved from ICT suites to Laptop trolleys and Tablets a borough wide roll out of new Wi-Fi installations were carried out throughout the majority of the schools.

The structured cabling installations were in the majority out of hours and in all cases the Wi-Fi units installed along with the data cabling

London Borough of Barnet - School Data cabling and WiFi Installation -See the full Case Study

Save

Save

Project:  Wyck Hill House Hotel - WIFI, Audio Visual, Telephone Systems and Data Cabling

Client: Arab Investments | Sector: Hotels / Hospitality | Duration: 4 Months

Wyck Hill House is a 60 bedroom country hotel in the Cotswolds. Consisting of a Main House, and 2 garden accommodation structures.

Audio Visual, Telephone Systems and Data cabling Wyck House Hotel

The hotel also has a high end in house spa with 6 treatment rooms.

NM Cabling was tasked with upgrading the WIFI, Audio Visual, Telephone Systems and Data cabling throughout

The works also included external service areas and a bespoke servicer call system for outside service and guest accommodation

Structured Cabling Installation

Data cabling was required throughout the hotel for Wi-Fi, Public Areas, Offices, Bar, Restaurant and Reception.

Due to the nature of the old building, bespoke routes and solutions were required for the data cabling installation and terminations. A lot of the data cabling was required to be run externally and hidden so as not to disturb the aesthetics of the country house

Audio Visual Installation

A SONOS music system was installed throughout the Bar, Reception, Dining, Library and Public Area. A bespoke audio system was also installed in the hotel large entertainment suite which is use for hosting conferences, meetings and weddings

Structured Cabling Installation Wyck House Hotel

Modern televisions were also upgraded and installed in every bedroom and public area

IT / Telecoms Equipment

NM Cabling headed the project management for the installation and setup of the IT and Telephone systems throughout the hotel.

Initially installing the data cabling for these systems, the company then rolled out the equipment into the rooms for the connection and setup by the hotels IT partners

Wi-Fi Installation

A free to access Wi-Fi system was installed through all guest bedroom, public and hotel management areas,

The data cabling installation, mounting and setup of the WI-FI units were all undertaken by NM Cabling

Wyck Hill House Hotel – WIFI, Audio Visual, Telephone Systems and Data Cabling -See the full Case Study

Save

Save

Project: MY Wellesley Yacht (ex Anedigmi) Data Cabling, Audio Visual, WiFi, IT and central control systems

Client: Private | Sector: Data Cabling - Marine | Duration - 11 Months

Wellesley Yacht (Anedigmi) Data Cabling and refurbish

The Wellesley Yacht (ex Anedigmi) started refurbishment and upgrade in February 2015 in Antalya, Turkey. The yacht was extended by 6 metres and a total refurbishment was undertaken

The NM Cabling project involved the Yacht Data Cabling, Audio Visual, WIFI, IT and central control systems

Distributed television systems for both Europe and the USA were incorporated and distributed to 11 separates living areas on the boat such as Cabins, Living Spaces, Crew and Captains Cabin.

Distributed music systems were also installed, all controlled from a central server to these areas plus an additional 3 outdoor decks and a Beach Club at the rear of the boat

Two main salons had surround sound systems incorporated with 85inch Screens to create an internal cinema experience.

The yacht is also to have an outdoor cinema fitted on the 2nd phase of work in April 2016

Wellesley Yacht (Anedigmi) Data Cabling and refurbish -deck area

Due to the construction of the boat and the heavy metal, glass and power elements throughout a sophisticated design was required for the WIFI system throughout. The Wi-Fi would control the music throughout the boat so a 0% black spot coverage was required around the entire boat

The IT requirements throughout the boat were also undertaken by NM Cabling. All the computers and printing systems were installed onto a central system and incorporated into the navigation and satellite control systems to allow the crew and Captain access throughout from one central PC and Tablet

MY Wellesley Yacht (ex Anedigmi) Data Cabling - See the full Case Study

Save

Save

Project: Fibre Optic London O2 Arena – Sky Bar

Client: Alpha Bristol | Sector: Fibre Optic Cabling -Events | Duration 1 Month

 

 

Fibre Optic Cabling for the Audio Visual Cabling requirements throughout the SKY bar at the O2 Arena in London. A vast amount of fibre optic cabling was used to run the screens, projectors and audio visual equipment

NM Cabling were tasked with terminating, testing and setting up all the fibre optic cabling throughout the bar and entertainment area.

There was also a Cat6 cabling requirement throughout for local cabling and controls

The work had to be carried out under strict time-scales, health and safety and access requirements.

Fibre optic cabling terminations were undertaken in the main communications area and off access towers in the main areas due to the height that the projectors and screens were mounted, creating a challenging installation

Fibre Optic -O2 Arena – Sky Bar, London - See the full Case study

Save

Save

Project: Imagination 25 Store Street, London

Client: Imagination Group / Abbeymead Building | Sector: Marketing | Duration: 12 Months

Imagination Data Cabling Atrium

Imagination are a worldwide marketing / branding company, during 2015 their head office based in Central London was completely re-furbished

The project involved data cabling, fibre optic cabling, floor boxes and containment, electrical installation, lighting and Audio Visual cabling

There are 6 floors on the front of the building where screed trunking and floor boxes were involved. There are 5 floors on the rear which are standard floor tile false floor installation requiring a range of expertise and service

Other areas included a display gallery, reception areas, security offices, restaurant and meeting rooms and boardrooms.

There is a central atrium area where lighting and data cabling needed to be installed via a high level boom lift

The time-scales throughout the project were very precise and tight due to the nature of the building remaining an operational office throughout the project. Each floor was phased in 2-3 week periods creating a fast track installation across all areas

Specialised areas were also included in the project due to the nature of Imagination’s operations. Edit suites with sound and vision editing equipment were installed; project design rooms with projectors, displays and specialised lighting were also part of the project

There was also a high end AV and IT laboratory which incorporated flood wiring of Electrical Cabling, Data Cabling and Audio Visual cabling links.

Imagination Group Data Cabling Lighting and AV - See the full Case study

Save

Save

Project: Fibre Optic Cabling - Bournemouth Pier

Client: Infologic | Sector:  Public | Duration: 1 Week

Fibre Optic Cabling Installation Bournemouth Pier

The main administration office and main incoming ISP and server are separated by a marine grade fibre link from one end of the Pier to the otherBournemouth Pier Fibre Optic Cabling Case Study

Due to general wear and tear on the previous Fibre Optic Cabling a new fibre link was required to be installed by NM Cabling on behalf of the Pier operator

The cabling had to be installed and secured under the pier itself and co-ordinated with the tides due to safety constrictions and feasibility of installation.

The Cabling also had to be marine grade to withstand the hostile environments associated with the pier and its location

Fibre Optic Cabling- Bournemouth Pier- See the full Case Study

Save

Save

Project: Leadenhall Building “The Cheesegrater” - London

Client: Stadium Wireless / Broadgate | Sector:  Office | Duration: 5 Months

Leadenhall Building London “The Cheesegrater” wireless internet (WIFI ) systems Basement installation

Cabling installation for the wireless internet (WIFI ) systems through the 50 floors and 4 Basements of the  Leadenhall Building, in cooperation with Stadium Wireless, NM Cabling installed the fibre optic backbones, localised copper cables and Wi-Fi units for the WIFI installation partner

The wireless network was for the coverage of the maintenance engineers and support staff of the building. This involved the cabling having to also being installed on the outside of the building to cover the window cleaning staff

The Wi-Fi system was specified by XIRRUS and a total of 250 hotspot access points were installed.

Internal and external wireless access points with separate coaxial antenna's were installed. These were placed in the outer skin of the building where there was a suspended walkway around each floor up to the 45th

The challenge of the project was the sheer size of the building and having to work over so many floors for the majority of the installation.

Leadenhall-Building-London-“The-Cheesegrater”-wireless-internet-WIFI-systems-Cable-runs

Fibre optic cables had to run from the 3rd Basement to floors 15,30 and 45 which involved, in the worst case scenario, 48 riser doors to access and install through

The main communications room was based in the 3rd basement and supplied 4 basement areas.

A combination of scaffold towers, scissor lifts and boom lifts were required to further enhance the complexity of the project.

The outside public areas were also covered by the wireless internet so that employees, visitors and staff using the communal garden space could login in, learn about the building and access free internet services

Leadenhall Building  London “The Cheesegrater” wireless internet (WIFI ) systems    - See the full Case Study

Save

Save

Project: Luxury Apartment, Knightsbridge

Client: Private | Sector:  Residential | Duration: 11 Months

This 2 bedroom luxury Apartment in Knightsbridge, London incorporated 6 Televisions and 8 Audio zones including bathroom televisions and music

AV-Cabling-Luxury-Apartment--Knightsbridge

Due to the minimalistic design not one element of the audio visual system was placed in the rooms but rather in a central communication area  and distributed over Cat6 cabling to each room for Television, and audio.

This allowed each of the televisions to hang as “picture frames” and have no sign of wires or controllers

Due to a limited amount of space for storage and design, the entire communications system was located centrally and distributed HDMI over cat6 freeing  furniture for use rather than storage of AV equipment and leads

It also allowed the 6 televisions to share the incoming satellite signals and channels

AV-Project-Bathroom-Mirror TVs

Mirrored Bathroom Televisions were installed to use as vanity mirrors and then as a television linked to the main central communications for a choice of Sky and Foreign Satellite and well as linking to the central music library

Stealth speakers were used throughout the whole house so not a single speaker could be seen. These speakers were installed in the fabric of the building, plastered over and then painted along with the rest of the room to completely hide the speakers without reducing sound quality

A Nuvo sound system was installed throughout, each room having a colour keypad showing the central music library by album cover, song, genre and even with a party mode for instant play throughout

These control units shared a central library enabling everyone to play separate music on call from a local source

Luxury Apartment, Knightsbridge- See the full Case Study

Save

Save

Project: The Wellesley Yacht Completed Project

Client: Saba Shipping | Sector: Marine | Duration: 11 months

The Wellesley Yacht Data Cable and AV Project

Luxury Yacht Audio Visual Marine Installations: The Wellesley Yacht is an extension of the luxury Wellesley Hotel in Knightsbridge and was designed in the same style, design and attention to high quality finishes and systems

The entire boat was entirely refurbished and NM Cabling’s remit was to install a distributed Television and Audio system throughout the 4 Bedrooms, Saloon and Games room

The focus was on being able to create a high end system that could also be contained into the small confines of a yacht

The yacht was also refurbished in Loana, Italy to add to the challenge

To distribute the 6 satellite boxes throughout , a 8 x 8 Wyrestorm Matrix was incorporated and everything was communicated using HDMI over Cat6 systems. This gave the yacht flexibility and the ability to upgrade from one central point

This was all contained within one central control cabinet

The Wellesley Yacht Data Cabling Installation Project - interior

Centrally based Sonos was used for the audio system due to its ability to be flexible and the ease of use for guest charters , such as being able to play their own music directly onto the system as well as use the central music library

Special attention was also given to the speakers throughout the boat and any equipment that was fitted. All speakers had to be marine grade due to high exposure to salt and the elements.

All the equipment had to be firmly secured and bolted down, including control leads due to the nature of the excessive movement of the boat during transport and the possibility of equipment jarring loose.

More about Luxury Yacht Audio Visual Marine Installations

The Wellesley Yacht Completed Project - See the Full Case Study

Save

Save

Project: Tower of London – Poppy Appeal

Client: Digital Avenue | Sector:  Event Wifi |  Duration: 1 Month

Fibre optic cabling Tower of London (c) Can Stock Photo

For the 2014 Poppy appeal DIGITAL AVENUE installed a WIFI system throughout the outskirts of the Tower of London so that visitors could log onto cloud WIFI, learn about the event and make donations

WIFI units were placed around the entire Tower Moat railings, to which each required a Cat6 data cable back to central data switches which were linked by fibre optic cabling back to the main controller

The work had to be carried out under strict guidelines from the Towers facilities team due to the delicate nature, historical listing and corrosion of the old existing structure

Great care also had to be taken to work alongside the team of volunteers who were planting the display flowers at the same time as the cabling was installed

To access the final WIFI locations on these railings surrounding the Tower, bespoke fixings and solutions had to be resolved as no drilling or fixings were permitted to the wall of the moat. However the installation had to be sturdy enough to prevent a breakdown, or accidental damage to the cable

steel tapered armoured fibre optic cable

To prevent damage by rodents, steel tapered armoured fibre optic cable had to be used which brought its own complications due to the increased technical nature in installing the cable especially without the ability to clip the cable to the external walls as it was installed

Tower of London – Poppy Appeal - See the full Case Study

Save

Save

Project: Avtrade Global Aviation Component Support

Client: Excell Group | Sector : Aviation |  Duration: 6 Months

A V Trade building view

Excell Group are the telecommunications provider for Avtrade and for their new head

office in Sayers Common, NM Cabling were procured for the data cabling works
throughout the warehouses, offices and plant rooms.

The project expanded into the cabling then being installed for the CCTV, door entry, Wi-Fi and PA systems for each of the hardware providers

The installation within the warehouse was all high level off boom lifts and scheduled in with a busy fit out of the warehouse racking and equipment and well as the construction work of other trades in the area

The presence of the warehouse racking, created some project management considerations regarding the location of cabling, the ability to run the cabling on the tray, around and through the racks and the limited amount of space to work in

The offices were installed using a grommet and GOP box design.

This allowed the cabling to be brought up inside the desks and then the ability to put the cabling back down into the floor and allow for flexibility in office desk layouts

There were also fibre optic cabling links throughout the building  and location to link to front gate entrances and link to Phases 2-4 of the site.

Avtrade New Global Headquarters - the UK Warehouse & Logistics Hub completes the first phase of Avtrade’s new global HQ development. With the Phase 2 offices plus 12,800 sq mtr extension to the new warehouse completion during 2014 to accommodate the expanding business.

Avtrade new head office  – Full Cabling Case study document

Save

Save

Project: The Sanctuary – Westminster AbbeyClient: Lee Bolton Monier Williams  | Sector: Solicitors | Duration: 3 months

VoIP System Installation Westminster Abbey

The Sanctuary – Westminster Abbey

In 2014 LBMW decided to upgrade their existing telephone system to a VOIP system.

Due to old legacy cabling  there was a requirement to upgrade the existing data cabling infrastructure to a Cat6 system over 5 floors

A satellite cabinet was placed on each floor and linked over fibre optic cabling backbones to the main communications room

From these cabinets local wiring was installed to the desk locations for Computers and Telephone connections

The works involved a high level of project management as all works had to be conducted out of hours with special attention to events on at Westminster Abbey when noisy works of any kind and deliveries had to be avoided.

Also the ground floor panelling was listed so creative routing was required in these areas for the installation

The works were completed over a series of weekends - ahead of schedule

The Sanctuary – Westminster Abbey – Full Cabling Case study document

Save

Save

Project: Wellesley Hotel - KnightsbridgeThe new hotel project in Knightsbridge to create a 5 star boutique hotel for the very highest end clients

NM Cabling managed the communications cabling project team role, co-ordinating all the hardware during design stage, construction and fit outNMC-Case-Study---Wellesley-Hotel-Bedroom-with-TV cable installation

NM Cabling was also responsible for the installation of all the Data Cable Installation, Audio Visual Installation, WIFI Installation and Communications room installation and patching

The data cabling infrastructure was installed under the project lead by Brookfield Multiplex and Mercury Engineering

The infrastructure project was a year in completion and on a tight time frame and working environment due to the location of the building and its access.

Wellesley Hotel - Full Cabling Case study document

 The Wellesley Hotel London - The newly opened Wellesley Hotel is a luxury boutique hotel in Knightsbridge London, one of the world’s finest hotels  The beautiful architectural surrounds and the impeccable service ensure that guests instantly feel welcome and comfortable at this luxury boutique London hotel

Save

Save

Project: UGG Stores Data Cabling Installation London

UGG Stores Data Cabling Installation London 1

Client: Deckers UK | Sector: Data Cabling - Retail | Duration - Multiple

Data cabling was installed throughout the UGG Store in Knightsbridge and in the off-site storage facility to allow a trial of a new software and hardware package.

The Data cabling Installation was carried out overnight while the store was closed to avoid disruption as the structured cabling extended throughout the shop floor and back office.

The UGG Stores Data Cabling Installation London 2

The job was completed as a fast track installation as all structured cabling needed to be complete and operational before the store reopened the next day

Dedicated security was arranged in advance to hastened the installation and minimise potential issues

The project has been rolled out to several other data cabling installations in UGG’s other London Stores

UGG Stores Data Cabling Installation London - See the full case study

Call NM Cabling 01923 888588 to talk about your network cable or AV installation project

Head Office
PO Box 605
Rickmansworth
Herts
WD3 0ANTel: 01923 888588
Fax: 01923 896065
[email protected]

London Office
c/o Roger Foord Associates
24 Lime Street
London
EC3M 7HS

Wiltshire Office
Office G01,
Castledown Enterprise Centre
Ludgershall,
Wiltshire,
SP11 9FA
Tel:01923 888588
Mob: 07841 457424