Royal Mail
Since 2001 the Royal Mail has been upgrading its communication networks to its mail sorting machines, involving high level out of hours works for fibre optic and cat 5e and cat6 cabling.
2 Nationwide roll out projects have been undertaken for all 72 mail centres to a total exceeding 1000 machines and terminals.
Throughout this period the centres have also undergone numerous moves and changes for the machine positions and the total moves over the last 5 years has taken our total number of visits past 200.
All works involve cabling installations on scissor lifts and boom lifts up to 15m in height and all works are carried out of hours.
Wolseley Group
The Wolseley group consists of approximately
1500 locations throughout the UK as well as throughout the
world. NM Cabling has been chosen to install data cabling
systems into a portion of these locations, such as Parts Centre,
Drain centre, Build centre and Bath Store.
As part of these projects 155 Bath Store locations required
a national rollout for an upgrade to its data network all
of which required completion inside a 6 week period.
Our company also undertook project management and data installations
for two warehouse relocations in Newbury and Worcester for
the group which involved a total new warranted data system
and fibre optic link system.
Broadsystems (News International)
Broad systems employed our company to provide an upgrade
to their communication room facilities in their head office
and satellite office locations.
Our company built resilient hosting data centers for the
company as well as manage their relocations and moves and
changes in the offices located at Manchester, Bristol, NW
London and Camden.
The upgrades required new data cabling to desk relocations,
new power requirements to the communication room servers and
all linked back to a new dedicated power board.
To install resilience into the room, new air conditioning
units, UPS systems and Generators were installed to protect
any eventuality or system failure.
All works had to be undertaken out of hours and on critical
time management due to the need to have minimal down time
for their servers and customers. The total project was project
managed by our company.
Phoenix IT
In 2001 our company began installations for Phoenix IT for
their 3 call centre location in Northampton.
As well as the new centre installations, works were required
to restructure the current communications rooms, and upgrade
the current administration data cabling and power requirements.
Our works involved installation for data cabling, fibre optic
cabling, power outlets and lightning systems, as well as UPS
installations and generators.
These projects involved in excess of 4000+ outlets and installations.
Park Plaza Hotels
For PPH locations in Victoria and Baker Street our company
was given the cabling installation for every low voltage cable
within the facilities.
Cabling was required for Data, Telephone, Fibre Optic, Microphones,
Televisions, Speakers, Conferencing, Mini Bars and Access
Control.
This resulted in approximately 10,000 cable outlets installed
over a 18 month period.
Communication cabling upgrades were also installed for the
group at their Shaw park plaza location.
London Borough of Barnet
Since 2000 our company has been an approved installer for
data installations for the borough.
Installation have been undertaken for Libraries, Schools,
Colleges, Offices, Children’s Centres, Youth Centres and all
associated council locations.
In 2006 a 50 centre roll out project was completed for the
upgrade to a VOIP phone and software upgrade which included
a requirement for all new cabling and communication room systems.
During this period a vast cabling upgrade was implemented
in the town hall to accommodate these new systems, with new
communication rooms being moved and created.
Bournemouth Council
For the restructuring of the council library facilities our
company has installed new data systems to accommodate new
library layouts, closures and amalgamations.
These projects have been undertaken on a roll out basis and
at many times out of hours in accordance with the roll out
programs.
Our company has also undertaken cabling in the councils office
facility based at the central library for the administration
staff.
|